I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Saturday, January 16, 2016

Empennage

Rudder (4.5 hrs)

Worked page 7-7 @ steps 1 & 2.   Cut trailing edge to correct length, and marked location in LH & RH rudder skins.     Set up drill press to #40 Drill Trailing Edge.  Used scrap Trailing Edge as wedge to orient 90 degrees to chord line of T.E.  Got idea from VAF forum in the Gotcha's thread.   [ see the xls file listed in Common traps  and mistakes -- in this case, a builder documented this recommendation]        
 Laser "crosshairs" really assist with initial set up at drill press.


 Step 3:  Attach LH and RH rudder skins, horn brace, and Attach Strips to Rudder skeleton.  Excellent fit of some complex parts, such as the horn brace.  

Lots of clecos required to set up for Final Drilling #40 holes with reamer.



100% cleco along trailing edge.   Worked from center outward toward top and bottom of rudder, alternately to provide minimum distortion.   Pleased so far with straightness of the T. E.

Also match drilled #40 leading edge one final hole at forward flange.   The fit of skins around counterbalance rib and tip rib seems really good.

Still need to complete one whole side.

Friday, January 15, 2016

Empennage

Rudder  (3.5 hrs)

Page 7-5.  Finished Step 2 riveting doublers, including Rudder Horn, Bottom Rib, & Shim.  Added plastic tie wrap clip with pop rivet.  Used several small washers to enable insertion from forward side (due to recess in clip).  Better to have rivet head on plastic vs expanding end.

Yeah!  Just in time, rec'd (6) K1000-6 platenuts, page 7-5.  Installed 2 needed 
Rudder skeleton is done,  so on to page 7-6.   Page 7-6: Step 1&2 cleco Tip Rib, Bottom Rib part B to skeleton.

Then cleco A to G stiffeners together (3 pieces each) and to skeleton.



Thursday, January 14, 2016

Empennage

Rudder (1.5 hrs)

Step 1 on page 7-5:  Cleco assembly making rudder "skeleton" (spar, several doublers, etc).
 Proceeded to rivet per instructions in Step 2 & 3.  About 1/2 done before I needed to quit for the day.
Today I'd scheduled to go flying in the afternoon - and the weather was perfect.  Mid 40's and mostly sunny with moderate southerly winds.  Fun day in the air.

1 of 3 large K1000-6 platenuts installed in pics above.   These mount the swivel bearings "bolts" as part of the rudder hinges.  

Waiting on Van's delivery of 6 more - the original inventory was missing (only 1 of seven were in a bag in Empennage Kit discovered during inventoried back in Dec ).   They sent last week 6 more platenuts - but they were way too small !    So now they're re-sending the correct size with apologies. Unfortunately, of the 7 page inventory listed for the Empennage Kit, these were needed early in process.    Expecting tomorrow or Sat...so I'll work around by assembling the stiffeners.   Gotta remember to install before adding skins permanently....since other 2 platenuts will be enclosed !

Wednesday, January 13, 2016

Empennage

Rudder (2.5 hrs)

Page 7-4  at Step 9:   Scuffed using maroon scotchbrite ALL doublers, rudder spar, top rib, bottom rib, and counterbalance rib.  Also Rudder Horn (aluminum extrusion...without Alclad requires full coverage for corrosion protection).   This is prep to spray with self-etching primer.
Scuffed, but not yet cleaned via Acetone.

I've purchased a new brand of self-etching primer; Napa 7220.  Seems to cover better, dry quickly with less tendency to run...and I prefer the medium grey color.  My Vertical Stab interior was primed using Duplicolor self-etching primer - "army green".  It was OK, but from builders postings I believe the Napa 7220 is a better product.  Of course it costs more too.
Nap 7220 grey is dark enough to see coverage.

Still searching for a cost effective source for Sherwin Williams GBP988.   A local S-W automotive store wanted approx $20 a rattle can (12 oz) !  That's double Napa 7220 price.   I'm going to redouble my efforts via internet to find a good source at better prices.

Note:  Although some builders prime all interior parts completely, I don't believe cost & added weight are worthwhile.  Van's describes as optional.  Since I plan to always hangar my aircraft and avoid exposure to corrosive environments (such as coastal regions), I'm using a limited coverage approach.  My strategy:  prime anywhere two surfaces are mated and any aluminum not Alclad.  Since I'm buying Quick Build Wings and QB Fuselage,  those will be primed by Van's process using S-W P60G2 (no pigment).  This seems to be a "minimum" protection, so makes no sense to heavily prime remainder of airplane.

Tuesday, January 12, 2016

Shop Set Up

Used leftover (from spray booth) 4 mil visqueen to separate "shop" from rest of garage.    Temps in shop with 1500 watt quartz heater has been barely 50 F.   Central Illinois January weather has been about average, with overnight temps reaching 0F.  


This should enable at least 60F in shop, maybe more on coldest days.  And less air exchange whenever cars come and go, too.

 My wife will be much happier to join me when I need another hand.   Plus, the compressor is now on other side...maybe just a bit quieter, too.

Empennage

Rudder (5hrs)

Sec 7-3 at Steps 2 & 3:  Cleco doublers, rudder control horn and bottom rib onto Rudder spar.  Final drill (ie ream) with #40 drill all the 1/8 holes with doublers.   Disassemble, then deburr.  Took about one hour....mostly due to deburring all the holes and edges.



Onto Sec 7-4 at Steps 1 & 2:   prep Rudder skins.   Working on Right side first, removing noted edge, and dimpling one hole along top edge.   Then Steps 3 - 5 for Left side Rudder skin.  Remove small tab, and dimple one hole along top edge also.   Deburred both skin along all edges.  Long process requiring extra care due to relatively thin aluminum sheet.   I used long file for most of the effort, instead of scotchbrite wheel on grinder.

Left skin has flange that overlaps other side at top front,  so performed ever so slightly bend edge with roller tool.  This minimizes edge rising up and gapping when later riveted.
Note slight difference in reflection along top edge above 3 holes.
Sec 7-4: Steps 6-9:  Cleco & final drill (ream) #30 holes in Top Rib and Counterbalance Rib.  Then deburr...   Interesting part was mounting the lead weight (counterweight for rudder).   #12 hole match drilled into rib.   Then dimpled to accept the AN509 countersink screw.    I used #12 Countersink on lead weight per instructions.  Then, since I did not have #10 dimple set, I sought guidance from Mike Lauritsen at Cleaveland Aircraft Tools .  He gave me easy solution: use my #8 dimple set that is very close, and simply insert countersink screw into dimple, with lead weight backing up the rib.   With proper support a couple moderate hammer blows set the head in just a small amount deeper to a flush level.  Perfect.  Thanks Mike !

Dimples in rib, countersinks in lead weight

This is side for washer and nut...



Monday, January 11, 2016

Empennage

Rudder  ( 2 hr )

Sec 7-2  Stiffener deburring.   Lots of parts and edges !


Step 4:  Radius corners on forward ends of R912 and R903 counterbalance ribs...to ease fit to skins.
Also fluted each rib to straighten out ribs...slightly only since almost straight prior.