Elevators ( 2 hrs )
Sect 9-09, Setp 2 Attached (cleco'd) LH and RH Elevator Horns. #30 (ie 1/8" holes) drilled at twelve times each horn - but those rivets are critical !
Step 3: Final Drilled all mating part holes not already done for Elevator assembly. Then dis-assembled - but critical to mark parts for later re-assembly. (used permanent marker with tape over to protect as scuff, acetone clean and prime parts. these are in areas entirely still covered 100% Alclad, so remain corrosion protected after remove tape at re-assembly) Only got RH Elevator completely "done", so planning next session to do same for LH side.
I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !
I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.
So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.
I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.
Thursday, April 7, 2016
Empennage
Elevator ( 2.5 hrs ) April 6 , 2016
Cont'd Sect 9-08, Steps 2 & 3: Cleco'd RH and LH Tip Assly's to Bottom Skins and Shear Clips. Final Drilled #30 holes 6 places each at interface to sub-assembly structure.
Step 4: RH Top Skin cleco'd w/ Trailing Edge added. Unique TE w/ thicker at end (Van's adjusted pitch sensitivity & control harmony on the RV14's with this small detail). Trimmed off excess length of TE, grinding to fit perfectly while also deburring edges. Per instructions, matched end to E 912 composite tip with slight taper top and bottom. Didn't take much, because tip has some thickness of several fiberglass layers at it's own TE. Repeated for LH Elevator (much shorter TE due to Trim Tab).
Cont'd Sect 9-08, Steps 2 & 3: Cleco'd RH and LH Tip Assly's to Bottom Skins and Shear Clips. Final Drilled #30 holes 6 places each at interface to sub-assembly structure.
![]() |
| Counterbalance skin goes UNDER the Top Skin. |
Step 4: RH Top Skin cleco'd w/ Trailing Edge added. Unique TE w/ thicker at end (Van's adjusted pitch sensitivity & control harmony on the RV14's with this small detail). Trimmed off excess length of TE, grinding to fit perfectly while also deburring edges. Per instructions, matched end to E 912 composite tip with slight taper top and bottom. Didn't take much, because tip has some thickness of several fiberglass layers at it's own TE. Repeated for LH Elevator (much shorter TE due to Trim Tab).
Impressive how top and bottom close out tabs fit perfectly with Shear Clip. I'd bent these 90 deg earlier, with one at 1/32 and one at 1/64 from bend line, to allow for overlap.
Tuesday, April 5, 2016
Empennage
Elevator (0.5 hrs)
Cont'd Sect 9-07: Completed Steps 4-6 for Trim Tab Hinges - Drilled #40 holes, and trimmed ends flush. Re-assembled to check alignment....seems very good.
Sect 9-08 at Step 1: Drilled small gussets in Left and Right Elevator assemblies.
Cont'd Sect 9-07: Completed Steps 4-6 for Trim Tab Hinges - Drilled #40 holes, and trimmed ends flush. Re-assembled to check alignment....seems very good.
![]() |
| Aft hinge 1/2 match drilled to Trim Tab Spar |
![]() |
| re-assembled: fits great. Will trim rod later.... |
Sect 9-08 at Step 1: Drilled small gussets in Left and Right Elevator assemblies.
Monday, April 4, 2016
Empennage
Elevator (4 hrs)
Continued Sect 9-04 w/ Step 4 & 5. Drilled 2 holes in end of Trim Tab Hinge while designating one Aft and other Fwd half. Sect 9-05 Step 1&2: Drilled 2 holes in Left Front Spar at 3/8" and 5/8" using Uni-Bit (tested/practised 1st w/ drill press on sample alum since 1st time doing this procedure). Cleco'd Left and Right Front Spars to Bottom Elevator Skins.
Sect 9-06 Steps 1-4: Assembled Ribs to Front Spar & Bottom Skins, along with Rear Spar and Root Rib. Also added Gussets and Shear Clips. Left side has more w/ doubler, etc for Trim actuator mounting.
Sect 9-07 Steps 1-3: Positioned precisely Fwd 1/2 piano Trim Tab Hinge. Match Drilled #40 with extra care to insure aligned...1st with clamps, replacing with clecos as hole drilled. Trimmed excess length of hinge.
Continued Sect 9-04 w/ Step 4 & 5. Drilled 2 holes in end of Trim Tab Hinge while designating one Aft and other Fwd half. Sect 9-05 Step 1&2: Drilled 2 holes in Left Front Spar at 3/8" and 5/8" using Uni-Bit (tested/practised 1st w/ drill press on sample alum since 1st time doing this procedure). Cleco'd Left and Right Front Spars to Bottom Elevator Skins.
![]() |
| Right side shown |
Sect 9-06 Steps 1-4: Assembled Ribs to Front Spar & Bottom Skins, along with Rear Spar and Root Rib. Also added Gussets and Shear Clips. Left side has more w/ doubler, etc for Trim actuator mounting.
![]() |
| Left side with Trim Tab mounting, etc. |
Sect 9-07 Steps 1-3: Positioned precisely Fwd 1/2 piano Trim Tab Hinge. Match Drilled #40 with extra care to insure aligned...1st with clamps, replacing with clecos as hole drilled. Trimmed excess length of hinge.
![]() |
| Trial re-attach Aft Hinge ...perfect alignment since pin slips in easily. |
Step 4: Cleco & Clamped Aft 1/2 Hinge to Trim Tab Spar. Ready to match drill tomorrow.
Sunday, April 3, 2016
Empennage
Elevator (1.5 hrs)

Step 3: Trimmed 1 of 2 Rear Spars for Left elevator.
Sect 9-03, Step 3. After removing vinyl at Close Out Tabs on Left Top & Left Bottom Skins, marked bend lines. This sets up Sect-04 Step 1 & 2 for each with set-back (one at 1/32, other at 1/64). Slightly staggers overlap, when assembled. Used wood block to bend initially by hand. Used rivet gun on low setting with wood block to easily finish the bend line - not too crisp, but consistent. Finished to 90 deg with hand seamer.
![]() |
| Bend at edge of table. |

Step 3: Trimmed 1 of 2 Rear Spars for Left elevator.
Saturday, April 2, 2016
Empennage
Elevator (4.5 hrs)
Sect 9-2 Step 4: Used hand seamer to adjust flanges to 90 deg on both E-904 Inboard Ribs and both E-903 Outboard Ribs. At Step 5, fluted each to insure all holes along flanges in a straight line - considerably more needed than typical on prior parts. Re-checked the 90 degs, and tweaked a few locations. Per instructions, insured holes are straight by "cleco'ing" the Counterbalance Skings to the Ribs. Perfect fit and alignment.
Pic shows where Elevator Tip Fairings will fit - but not until much later at Sect 12-05. Curious about fit, etc....


Sect 9-3: Step 2: For Trim Tab Skings, removed hatched areas per plans for Close-Out Tabs at each end.
Sect 9-2 Step 4: Used hand seamer to adjust flanges to 90 deg on both E-904 Inboard Ribs and both E-903 Outboard Ribs. At Step 5, fluted each to insure all holes along flanges in a straight line - considerably more needed than typical on prior parts. Re-checked the 90 degs, and tweaked a few locations. Per instructions, insured holes are straight by "cleco'ing" the Counterbalance Skings to the Ribs. Perfect fit and alignment.
Steps 6 & 7: Assembled Tip Rib Assembly. Cleco'd, and Final Drilled (#30 Reamer) holes in mating Ribs, and FD the holes (#40 reamer) in flanges to Counterbalance Skins (2X).
Sect 9-03, Step 1: cut out templates from page 29 (actually used photocopies after insuring true 1:1 size). Worked well to apply spray adhesive to each surface. Bandsaw cut out Foam Ribs. Used a gentle touch on 6" Disc sander to finish edges to the template's lines. All Foam Ribs finish sanded, and ready to use.


Sect 9-3: Step 2: For Trim Tab Skings, removed hatched areas per plans for Close-Out Tabs at each end.
Friday, April 1, 2016
Empennage
Elevator (1.5 hrs)
Finished Page 9-2 Step 1 by deburring all edges...a LOT of edges for all 12 Ribs. Time consuming, but good to get these done today.
Step 2 was simply cleco'ing together top and bottom Ribs. The 12th one is top only, since later it will be joined to part of Trim Tap mount for lower portion.
Finished Page 9-2 Step 1 by deburring all edges...a LOT of edges for all 12 Ribs. Time consuming, but good to get these done today.
Step 2 was simply cleco'ing together top and bottom Ribs. The 12th one is top only, since later it will be joined to part of Trim Tap mount for lower portion.
Subscribe to:
Posts (Atom)
















