I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Wednesday, January 3, 2018

Finish Kit

Brake Lines ( 3 hrs )

Received from Van's the AN365-524 nuts to replace MS21083  N5 shear nuts on the Gear Braces per Sect 29-03 -- torqued per Sect 40A-04 (Fig 4).  See entry dated Dec 21, 2017.  Completed LH & RH Brake Line installation per Sect 40A-10 Steps 1-8, which was last page of Sect 40A "Tricycle Gear & Engine Mount".  Conforming 1/4" OD alum tube to align with Leg, then wrap around at bottom was "easier" than imagined.
straightened tubes, added various
pieces, then flared each end
 

 

will be covered by aerodynamic Leg fairing


route stays inside profile of  Wheel Fairing 
 

Saturday, December 30, 2017

Finish Kit

Axle Shims, Wheels & Brakes installed ( 4 hrs )

Ground two 8" x 3/8" Bolts creating drift pins for Wing to Spar assembly (Sect 41-03, Step 1).  Rec'd Shims from Vans, so installed immediately to correct excessive toe-in.   Now measures 0 deg for RH, and 0.15 deg for LH -- both within max 0.25 deg specified.  Installed Wheels per 40-09 Step 1, following both Vans and Grove instructions.   Installed Brake Caliper Assl'y per Step 2 at 40-09.  Safety wired two Back Plate Bolts on each Caliper - my first time doing bolts.  You-Tube has many example videos that really helped.   Need Permatex #59214 high temp sealant for pipe elbow fittings (for brake lines)...so not added yet in photos.
Waiting for Shims....so created Drift Pins for later
Shims arrived...Yay 
 
RH Shim installed,  0 deg measured
LH Shim installed, 0.15 deg measured



Wheel Nut & cotter pin installed

Grove Brake Calipers
Installed;  prior safety wiring Back Plate nuts


Tah Dah !   Now on all 3 Wheels

Safety Wire for Back Plate Nuts

Friday, December 29, 2017

Finish Kit

Fuel Lines ( 3 hrs )

Built Left and Right Fuel Vent Lines (1/4") using new tools just rec'd from Aircraft Spruce:   Rolo-Flair Flaring Tool (37 deg) and Imperial 470FH Triple Head 180 Tubing Bender.  Practiced on some pieces, then followed Sect 41-10 Steps 1-6.  Also built Left and Right Fuel Lines for Tank to Fuselaage.  These are 3/8" dia with "S" bends  -- tough to get only 5/8" between bends, but managed.  These will be completed once I have Wings installed for final length & flare at inboard ends.

Wednesday, December 27, 2017

Finish Kit

Toe In of Main Axles  ( 3 hrs )

Per instructions Sect 40A-08,  Steps 1-3 measured Toe-In of Main Gear Axles.  Spec'd to be maximum 0.25 degrees (either toe in or toe out acceptable if less than 0.25 degrees).   I measured Left axle at 0.9 degrees, and Right at 0.56 degrees.  I used feeler gages to measure "Y", then converted to angle per provided chart.   Since both above 0.25 degrees I ordered Axle Shims U00013A (0.75 deg) and U00013B (0.50 deg) to change to only 0.15 deg on Left, and ~0 on Right.  These are pricey at $25 each...I was hoping I wouldn't need any.  Vans shipped Priority Mail - for extra $5 - so may arrive Saturday.   Meanwhile, worked on misc items - installed 2 Defog fans in Glare Shield per Sect 38-32 Steps 2.
challenging to determine gap, but feeler gages work well.

documented before and shims needed.

needed very short philips between Glare Shield and Canopy. 
Even socket wrench too "big", so used locking pliers taped
to avoid scratching paint or canopy

2 fans to keep Avionics cool and Defog canopy

Tuesday, December 26, 2017

Finish Kit

Nose Wheel Installed ( 5 hrs )

Installed Nose Fork and Nose Wheel/Tire assembly per Sect 40A-07 Steps 1-7.  Used engine hoist to lift fuselage higher to get supports underneath so clearance for mounting fork.   Tightened large 1 3/4" nut on Spindle , compressing belleville washers  - until met side pull of 26 lb specified.  Glad I purchased socket recently at $13, so didn't mess up nut with channel locks, etc).   Didn't need a breaker bar or long handle, since actual torque was moderate.   I did need to drill new #30 size holes at 90 deg to original for cotter pin to get the right position.  As the belleville washers are compressed by the nut, rotating the nut just a few degrees made a large difference in side pull.    Next, installed Matco wheel and axle - and torqued through bolt (this set up avoids Van's version with compromise between tight and too tight for tapered roller bearing).  Then attached Main Gear Leg Axles per Step 1 at Sect 40A-08.  The Brake Torque Plate was confusing to correctly identify correct 4 of 8 holes, but got it done too.  Next:  check toe-in or toe-out...maybe ready to mount Main tires.
full turn against stops


tah dah !
 

adapters: 3/8 to 1/2  &  1/2 to 3/4
Main Gear Axle with Brake Torque Plate


Old tennis ball protects ankles and legs until wheels installed

Saturday, December 23, 2017

Finish Kit

Nose Gear Link Assembly ( 2 hrs )

Completed Nose Gear Link Assembly per Steps 1-6 at Sect 40A-05.  Most of time required to clean up extra powder coat at certain bearing faces, etc.  Fun putting together 4 Lord rubber mounts (originally for Mooney apparently ) along with variety bushings and misc hardware.  Add Nose Fork next - getting closer to having Fuselage on wheels.

Nose fork beside Gear Leg

Friday, December 22, 2017

Finish Kit

Nose Gear Install  ( 2 hrs )

Attached Nose Gear Leg to Engine Mount per Sect 40A-05 Steps 1-4.    Prepped variety pieces  so ready to complete assembly next.
Boxes in background are rubber isolators,
and blue axles are for Main Gear.