I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Monday, April 2, 2018

Firewall Forward Kit

Installed Cowl Baffles ( 4 hrs )

Decided to complete connection of MAP lines prior to completing the cowl baffles - in case any interference.  Installed AN823-4 Steel 45 deg Elbow (replaced AN816-4D straight fitting) per Aircraft Speciality design for connection of Single PMAG manifold air pressure hoses.  Tightened flare fitting at elbow, and applied Herbie Clamp to silicone hose at other end. [ ref Jan 26, 2018 log "Map Hose Assembly ]   Installed Left and Right Aft Baffles to engine per Sect 47-07, Steps 2-4.  No trimming of baffles needed - fit to engine was good first pass.  And, didn't need to remove Oil Filler Tube.  Assembled Left and Right Forward Baffles per 47-13 per Step 1.  First riveted CB-00011 to Left Fwd Baffle per Step 4 at 47-12 (initially not sure possible to assemble onto engine w/ this part attached, but riveting after looked almost impossible too).  I had to trim CB-00011 to fit engine case so all bolt holes would align.  This gave me practise getting the assl'y on and off a few times - so I got better at twisting and turning it around Prop Governor.  Aaarrrgggh !
Completed MAP lines between engine, sensor, and PMAG







Friday, March 30, 2018

Firewall Forward Kit

Baffles, cont'd ( 3 hrs )

Completed Right Air Ramp per Sect 47-10 and Right Forward Baffle at 47-11.  Added RTV strips to Left and Right Forward Baffles per Step 1 at Sect 47-12. 

Thursday, March 29, 2018

Firewall Forward Kit

More Baffles ( 2 hrs )

Deburred holes and edges on several cowl baffle pieces for Sect 47-10 & -11.   Added nutplates and applied RTV to Vent Screen and Vent DL-03.

Wednesday, March 28, 2018

Firewall Forward Kit

Left Air Ramp and Air Filter Frame ( 3 hrs )

Assembled Left Air Ramp and Air Filter Frame - mix of deburring and cutting/sanding fiberglass.  Completed Sect 47-08 Steps 11-11, and Steps 1-9 at Sect 47-09 - except a few details.
fiberglass frame cut to size, nutplates riveted on

Left Forward Baffle nearing completion.

Tuesday, March 27, 2018

Firewall Forward Kit

RTV on Cowl Baffles ( 2 hrs )

Installed Brackets to engine per Steps 2-6 at Sect 47-06.  Applied Red RTV (high temp) to Aft Baffles per 47-07.   Tip by Vans to use masking tape works well to provide neat "stripes".
fwd bracket left finger tight until baffle installed

1 of  2 done  - masking tape helps keep mess to minimum.

Monday, March 26, 2018

Firewall Forward Kit

Cowl Baffles cont'd ( 2 hrs )

Completed Cylinder 3 Baffle and RH Aft Baffle at 47-05, Steps 1-5.  I've decided to not prime or paint the cowl baffles after checking what several other builders have done (or not done).  Prepped Aft Center and Center Brackets per Sect 47-06 - these I decided to prime and paint ( Rustoleum Professional Stainless Steel).
rear side of  Right Aft Baffle



deburred, buffed, then primed and finish coated brackets w/
Rustoleum Professional Stainless Steel color used
elsewhere on firewall

Saturday, March 24, 2018

Firewall Forward Kit

Continued Cowl Baffles ( 4 hrs )

Completed Left Aft Baffle per Steps 1-8 @ Sect 47-03, and Right Aft Baffle Steps 1-11 @ 47-04.  Variety rivets, Mach C'sink, and dimpling for "entertainment".