I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Sunday, June 10, 2018

Finish Kit

Inlet Ramps on Top Cowl ( 1 hr )

Sanded, mixed epoxy-microballoon mix, applied to areas indicated in Fig 1 to provide smooth transitions for baffle seals.  (note: I temporarily positioned Top Cowl onto Fuse to mark baffle alignment onto Inlet Ramps as double check)   Filled holes from clecos. Steps 5-11 per Sect 45-20.
black marks on Inlet Ramps indicate locations for
baffles at transitions to Cowl 

Friday, June 8, 2018

Finish Kit

Inlet Ramps bonded into Top Cowl ( 4 hrs )

Used dremel to trim RH and LH Inlet Ramps to fit Top Cowl per Step 2, Sect 45-19.  Lots of iterations - and lots of dust - to get good fit all around.  Prepped for bonding, mixed batch of epoxy & cotton flox, then installed per Sect 45-20 Steps 1-4.  Re-installed Top Cowl using all the hinge pins to insure cowl maintained shape and alignment. (worked ahead couple steps, pre-shaping edges for Baffle Seal contact,  so I could use excess flox to start smoothing transitions)
clecos installed once final trimming done
bonded and first layer transition layer applied 


checking out surfaces via RH side air intake

LH Inlet Ramp clears Prop Gov control.  Later, a 1" thick
foam seal is applied to stop airflow where not wanted

another view of LH Inlet Ramp and Prop Gov control.

Tuesday, June 5, 2018

Finish Kit

Riveting Hinges to Cowls ( 6 hrs )

Completed mach c'sinking and riveting hinges to Top and Bottom Cowls per Steps 1-8 at 45-18.  Re-assembled to Fuse, and ...Ta-Dah !  Good fit...with consistent gaps at seams, too.   Started 45-19 Step 1 trimming LH & RH Inlet Ramps for Top Cowl.
Top Cowl riveting done

Bottom Cowl riveting done, mtd to Fuse

First time mounted via hinge pins all around

side view...pleased with fit

looking good !  Yay!

trimmed Inlet Ramps to scribe lines from molds. 
The diamond encrusted mini-wheels cut fiberglass really well

Friday, June 1, 2018

Finish Kit

Riveting Hinges onto Cowls ( 3 hrs )

Removed hinges, deburred, buffed w/ scotchbrite, cleaned w/ acetone, primed with Napa 7220 self-etching primer, then painted with Rustoleum Engine Enamel (good to 500 deg) per Steps 1-5 at Sect 45-18.  Re-attached w/ clecos in every other hole enabling mach c'sink from flush rivets.  Riveted, then repeated for other holes.  Only done with aft hinges on Top Cowl, but making progress.

flush rivets...!

Thursday, May 31, 2018

Finish Kit

Epoxy coating on inside Cowls ( 2 hrs )

Removed hinges from Cowls to deburr.  Coated interior of Cowls w/ thin layer epoxy resin to make impervious to oil and easier to clean...per Step 6 at 45-16.
Squeegee and foam brush worked well to apply even, thin coating epoxy. 
Bottom Cowl is ~ 1/2 done in this pic

Tuesday, May 29, 2018

Finish Kit

Top and Bottom Cowl  ( 6 hrs )

Inserted Cowl Hinge Pins (horiz upper hinge halves) per Sect 45-14 Step 1-10. Cut clearances for Hinge Pins on LH and RH sides  - but will install Cowl Pin Covers soon instead of finishing for tab mounting. Marked and drilled holes for upper hinge pins on Top Cowl.  Re-installed -- alignment still very good, so match drilled #40 holes per Steps11 at 45-15.   Drilled holes each side Spinner per 45-16, then riveted on 4 nutplates per Steps 1-4 at 45-17.   Used Cowl Pin Cover templates to mark  cut-outs on each side.
marked & drilled Top Cowl  upper hinge

Drilled & cleco'd...

Top Cowl with hinges attached (clecos).

Bottom Cowl w/ hinges attached.  2 holes each side spinner, too

nutplates beside spinner on Bottom Cowl

LH template used to mark for cutout -
Cowl Pin Covers

Saturday, May 26, 2018

Finish Kit

Bottom Cowl ( 4 hrs )

Mounted  Bottom Cowl in final position w/o Top Cowl per Steps 13-16 at Sect 45-11.  Clamped vertical hinges then match drilled 19x per side per Steps 1-5 in Sect 45-12.  Checked fit with Top Cowl after 1st holes/cleco - remained A-OK, so proceeded.  Positioned horiz lower hinges,  marked and drilled 31x each side.   Looking great.
vertical hinge drilled for LH side Bottom Cowl
inside view...cleco


horiz hinge lower section clamped, holes marked

checking positioning of Cowl Pins...option I purchased


pleased with fit !