Jan 9, 2016 (almost caught up to new builders log)
Rudder first steps (3 hrs)
Rudder. Started Sec 7-2 Step 1,2 & 3. Used band saw to quickly separate lots of pieces. Getting better at quickly deburring parts on scotchbrite wheel.
Sec 7-3 at Step 1. Radius corners of extruded alum Rudder Horn. Couple iterations to get clearance along top edge to forward edge of Bottom Rib - but can't add material back !
Seems like a lot of time, but this includes reading through manual couple times to insure understand assembly steps, checking Gotchas from VAF, etc.
I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !
I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.
So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.
I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.
Monday, January 11, 2016
Empennage
Jan 9, 2016 (catching up in new blog...almost there!)
Vertical Stab (2hrs)
Sec 6-5 Step 3. Almost done with Vert Stab assembly (at least this section of manual).
Key is following sequence along front spar from "center" to tip, then center back to root. I was concerned with reaching these and "blind" bucking, but went better than expected. Checking shop ends by pressing finger onto head, then measuring depression on finger. While fingers get sore after awhile, sure feels good to get this part done.
Pics below show finished Vertical Stab...at least completed Section 6. Hooray...!
Above pics show after completing Step 4 - rivet along top and bottom, and along rear spar. Required mostly Main Squeeze, but several required rivet gun and bucking bar due to limited access. 470 heads in spar next to skin rivets often prevented using squeezer. Some I could do after switching sets, changing spacing, etc. This last step took a little longer than expected, but looks great when done.
Vertical Stab (2hrs)
Sec 6-5 Step 3. Almost done with Vert Stab assembly (at least this section of manual).
Key is following sequence along front spar from "center" to tip, then center back to root. I was concerned with reaching these and "blind" bucking, but went better than expected. Checking shop ends by pressing finger onto head, then measuring depression on finger. While fingers get sore after awhile, sure feels good to get this part done.
Pics below show finished Vertical Stab...at least completed Section 6. Hooray...!
![]() |
| Great idea to tape over holes to leave unfilled. Easy to get confused as focused on riveting. |
Above pics show after completing Step 4 - rivet along top and bottom, and along rear spar. Required mostly Main Squeeze, but several required rivet gun and bucking bar due to limited access. 470 heads in spar next to skin rivets often prevented using squeezer. Some I could do after switching sets, changing spacing, etc. This last step took a little longer than expected, but looks great when done.
Empennage
Jan 8, 2016 (catching up in new builder's blog)
Vert Stab (5 hrs )
Sec 6-5 Step 1 & 2 Finished riveting ribs to front spar. Challenging to not scratch primer. Cleco skin to front ribs and front spar. Good fit of skin at leading edge to nose rib and tip rib (success !). Some extra clamping to insure flanges stay tight to skin when riveting.
No pics today...I need to remember to take pics along each major step, or at least each day. Having too much fun making good progress.
Vert Stab (5 hrs )
Sec 6-5 Step 1 & 2 Finished riveting ribs to front spar. Challenging to not scratch primer. Cleco skin to front ribs and front spar. Good fit of skin at leading edge to nose rib and tip rib (success !). Some extra clamping to insure flanges stay tight to skin when riveting.
No pics today...I need to remember to take pics along each major step, or at least each day. Having too much fun making good progress.
Sunday, January 10, 2016
Empennage
Jan 7, 2016 (catching up in new builder's blog)
Vertical Stab (3.5 hrs )
Sec 6-4 Step 6 Rivet Rear spar & hinges. Great to see parts coming together. Lots of different length and style rivets, but instructions are clear. Surprised how much "grunt" takes to use Main Squeeze on the 1/8 inch rivets. Lots of rivets, so got good exercise in arms.
Applying primer only to surfaces "scratched" during processing. Trying to avoid excessive weight. Some areas only receive light coat if Alclad is not been scratched.
Vertical Stab (3.5 hrs )
Sec 6-4 Step 6 Rivet Rear spar & hinges. Great to see parts coming together. Lots of different length and style rivets, but instructions are clear. Surprised how much "grunt" takes to use Main Squeeze on the 1/8 inch rivets. Lots of rivets, so got good exercise in arms.
Applying primer only to surfaces "scratched" during processing. Trying to avoid excessive weight. Some areas only receive light coat if Alclad is not been scratched.
![]() |
| Hole left open for Sec 10-05, 10-28, & 11-07. |
![]() |
| Tape over some holes is temporary - until assembly with skin. |
Sec 6-5 Step 1. Assembled Front Spar. (no pics) This simple step is challenging due to access to the rivets at angled flanges. Worked through different set ups for each "joint" to enable proper access.
Empennage
Jan 6, 2016 (catching up in new builder's log)
Vertical Stab (5 hrs)
Sec 6-4 Step 4 & 5. Dimpled #40 holes in flanges of skeleton (ribs and spars). Used Main Squeeze tool. Set up drill press to use Micro Stop CS tool for #30 holes on Rear Spar doubler. No pictures...but worked great.
Really careful to understand front and rear faces for dimple directions on Rear Spar (so will be flush facing forward !)
Prepped parts for priming by final scuffing, then clean thoroughly with Acetone. Using good respirator - can't even smell the acetone or primer.
Vertical Stab (5 hrs)
Sec 6-4 Step 4 & 5. Dimpled #40 holes in flanges of skeleton (ribs and spars). Used Main Squeeze tool. Set up drill press to use Micro Stop CS tool for #30 holes on Rear Spar doubler. No pictures...but worked great.
Prepped parts for priming by final scuffing, then clean thoroughly with Acetone. Using good respirator - can't even smell the acetone or primer.
Empennage
Jan 5, 2016 (catching up in new builder's log)
Vertical Stab (5.5 hrs)
Sec 6-4 Step 4. Disassemble skin and skeleton to deburr, then scotchbrite, then dimple to be followed last by priming parts.
Note: Contacted Van's tech support to clarify OK to Prime after Dimple if preferred (vs Dimple after Prime. Concern was dimple process could "scratch" primed surfaces). Also easier to scuff parts prior to dimpling to avoid need to scuff inside countersunk holes.
This established DDSDAP steps: Drill, Deburr, Scotchbrite, Dimple, Acetone clean, and finally Prime.
Cleaned with Acetone. Too late and tired to prime, since needed final touches on new spray booth.
Vertical Stab (5.5 hrs)
Sec 6-4 Step 4. Disassemble skin and skeleton to deburr, then scotchbrite, then dimple to be followed last by priming parts.
Note: Contacted Van's tech support to clarify OK to Prime after Dimple if preferred (vs Dimple after Prime. Concern was dimple process could "scratch" primed surfaces). Also easier to scuff parts prior to dimpling to avoid need to scuff inside countersunk holes.
This established DDSDAP steps: Drill, Deburr, Scotchbrite, Dimple, Acetone clean, and finally Prime.
![]() |
| C Frame reached all holes on skin. Care to not overbend leading edge. |
![]() |
| trial fit flush rivet. |
![]() |
| Some holes taped to leave to later processing for fairing attachment. |
Empennage / Shop Set Up
Jan 3, 2016 (catching up in new builder's log)
Build temporary/portable spray booth (5 hrs)
Needed spray booth to do priming of interior parts. Too cold in winter in central Illinois to do outside, but with self-etching primer, really necessary to evacuate air. Designed to fit into one of twin "man doors" in south wall of garage.
Built with hinges at all joints so can simply fold up both and store against nearby wall. Used inexpensive 1x2's, 4mil visqueen (sp?), and lots of staples. Installed 20 inch box fan to evacuate.
In middle, used old fencing section to hang misc components.
Works great !
Build temporary/portable spray booth (5 hrs)
Needed spray booth to do priming of interior parts. Too cold in winter in central Illinois to do outside, but with self-etching primer, really necessary to evacuate air. Designed to fit into one of twin "man doors" in south wall of garage.
Built with hinges at all joints so can simply fold up both and store against nearby wall. Used inexpensive 1x2's, 4mil visqueen (sp?), and lots of staples. Installed 20 inch box fan to evacuate.
In middle, used old fencing section to hang misc components.
Works great !
![]() |
| Prior to installing fan at door, etc. |
![]() |
| Inital test to try "folding" against wall. |
![]() |
| 1st parts ready to prime |
![]() |
| Initial prime coat |