Aft Fuselage (2.5 hrs )
Sect 10-11, Steps 1 & 2: worked on the two larger forward Bulkheads....doing all the #40 hole dimples around the flanges...with a few exceptions noted.
Lots of lightening holes which take time to smooth edges/deburr. Tried various tools (eg dremel to reach inside holes) but mostly the std 6" grinder w/ scotchbrite wheel. Although instructions don't denote, I smoothed facets of flanges...just as prior bulkheads. Finding a 4" belt /6" disc sander with fine grit paper works well for that step.
Also enlarged one hole to 5/8" hole w/ step drill...for bushing w/ wire routing. Seems odd several similar 5/8" holes already pre-punched - must be busy work for builder wrt 51% rule...?
I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !
I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.
So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.
I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.
Wednesday, May 25, 2016
Tuesday, May 24, 2016
Empennage
Monday, May 23, 2016
Empennage
Aft Fuselage (4 hrs )
Sect 10-9 Step 2-7 completed: finished deburring edges, holes and smoothed flange facets. Checked fit into Aft Bottom Skin... A-OK! (no fluting needed ...bulkheads were already straight and fit well)
Also cleco'd rearmost Bulkhead w/ Tie Down Bracket into position on Aft Bottom Skin. Also good fit. (prior sub-assembly is already primed)
Dimpled the #40 and optional #27 holes for the flush screws installation later (ordered screws and nutplates from Van's today).
Riveted two H.S. Attach Brackets to these two bulkheads w/ 30 universal head size 4-7 rivets. Appreciated using Main Squeeze again (needed to add 3 washers to lengthen reach of Universal die for flange height clearance).
Sect 10-10 Steps 1-3: Next bulkhead sub-assembly includes "step drilling the 5/8" hole for bushing, dimpling #40 holes on flanges, deburring edges and holes, plus smoothing facets on flanges...again. I prefer working each section (bulkhead sub-assembly) as mini-project following instructions in sequence, vs gathering all the bulkhead pieces and deburring, scuffing and priming as major batch. With nice weather, set up outside to spray primer takes only a minute, so small batches are easy
Sect 10-9 Step 2-7 completed: finished deburring edges, holes and smoothed flange facets. Checked fit into Aft Bottom Skin... A-OK! (no fluting needed ...bulkheads were already straight and fit well)
Dimpled the #40 and optional #27 holes for the flush screws installation later (ordered screws and nutplates from Van's today).
Riveted two H.S. Attach Brackets to these two bulkheads w/ 30 universal head size 4-7 rivets. Appreciated using Main Squeeze again (needed to add 3 washers to lengthen reach of Universal die for flange height clearance).
Sect 10-10 Steps 1-3: Next bulkhead sub-assembly includes "step drilling the 5/8" hole for bushing, dimpling #40 holes on flanges, deburring edges and holes, plus smoothing facets on flanges...again. I prefer working each section (bulkhead sub-assembly) as mini-project following instructions in sequence, vs gathering all the bulkhead pieces and deburring, scuffing and priming as major batch. With nice weather, set up outside to spray primer takes only a minute, so small batches are easy
Sunday, May 22, 2016
Empennage
Aft Fuselage (1.5 hrs )
Riveted Tie Down Bracket to 2 Bulkheads 1412A & B in Sect 10-8, Step 2. Able to use Main Squeeze, but only with a washer added to each die to clear flanges. Perfect !
Sect 10-9, Steps 1 & 2: Cleco'd 1411A & B Bulkheads to HS Attach Bars, drilled #30 holes (lots for these key structural pieces). Started to deburr edges...here I go again toward priming. (with simpler spraying now outdoors, I'm closely following instructions vs working ahead to prime parts well in advance).
Riveted Tie Down Bracket to 2 Bulkheads 1412A & B in Sect 10-8, Step 2. Able to use Main Squeeze, but only with a washer added to each die to clear flanges. Perfect !
![]() |
| Much easier with Main Squeeze mounted to table... |
Saturday, May 21, 2016
Empennage
Sect 10-5 Steps 2 & 3: Drilled 17/64 Systems hole (several layers including steel VS hinge brackets) and Tie Down Bracket 4 holes at #12 size.
Sect 10-6 Deburred edges, drilled holes, rounded flanges eliminating facets against skins. Sect 10-7, Steps 1-3: Lots of dimples in two bulkheads...sizes #30, #40, and #27 (#6 screw dimple dies works well). With those completed, time to scuf, clean w/ Acetone, and Spray 7220 Self Etching Primer (Napa brand). Ready to rivet !
![]() |
| Ready to Prime. Parts on left are Not Alclad, so require Primer. |
Friday, May 20, 2016
Empennage
Thursday, May 19, 2016
Empennage
Aft Fuselage ( 1 hr )
Another beautiful Spring day - Sunny, 70 degrees, and only 4 mph winds....so went flying instead of building today. Plus mowed yard, played tennis. Thus only 1 hr in shop today. Rudder Stops in Sect 10-4 are crazy shaped pieces ! Required extra caution to insure interpret cut dimensions correctly. Note the isometric dwg above has parts "flipped" vs 2 view dwgs below. Need new 18 pitch band saw blade...so only finished RH piece.
Another beautiful Spring day - Sunny, 70 degrees, and only 4 mph winds....so went flying instead of building today. Plus mowed yard, played tennis. Thus only 1 hr in shop today. Rudder Stops in Sect 10-4 are crazy shaped pieces ! Required extra caution to insure interpret cut dimensions correctly. Note the isometric dwg above has parts "flipped" vs 2 view dwgs below. Need new 18 pitch band saw blade...so only finished RH piece.