No building most of this week while we transferred my dad from Assisted Living into a Skilled Nursing facility - lots of packing & unpacking, etc. My brother visited from Calif during the week to assist getting the move done. Back to building by repeating Sect 24-03 Steps 8-10: started the RH Tip w/ #40 holes - cleco'd (its time consuming to get alignment -- but finally it was ready) Then drilled #27 holes first at every other #40 cleco. Using #30 cleco's "works", but since slightly loose I was extra careful to insure ALL were enlarged with proper Tip to Wing alignment maintained.
note alternating cleco sizes as I enlarge holes |
No comments:
Post a Comment