Wing Root Fairings ( 4 hrs )
Completed LH & RH Wing Root Fairings per Sect 41-04, Steps 1-14 (except Steps 6-9 requiring Wings installed ). Completed deburring, then dimpled all holes (for #8 screws, and rivets). Riveted 18 stiffeners onto Top Fairings using rivet gun with back rivet tool and metal back up plate - really easy. Marked and bent Lower Fairings to conform to Wing leading edge. Been awhile since I used these set ups...kinda "fun".
 |
ready to dimple w/ C Frame |
 |
back riveting |
 |
trial fit on RH side Fuselage |
No comments:
Post a Comment