Drilled aft holes on Top Cowl, then match drilled into hinges after re-installing onto Fuse. 42 holes filled with clecos per Steps 1-8 at Sect 45-10. Started 45-1; mounting Bottom Cowl. Marked aft edges for trimming (less than 1/8") using tool Carl & Rafael showed in their build log. Stopped early to go flying prior planning meeting at airport for annual Father's Day breakfast/fly-in.
snapped pic inside/under cowl - checking locations of holes in hinge. |
added Bottom Cowl. Sawhorse good height to defy gravity. Horiz line is shadow where Top finished edge overlaps untrimmed Bottom Cowl, |
After checking alignment &, taping in place, I marked aft edge of Bottom Cowl for trimming |
No comments:
Post a Comment