Completed sanding Bottom Cowl inlets after test fit to Fuselage and Baffles (and another iteration for final tweaks). Assembled Top to Bottom per Step 3 at Sect 47-27 to compare offsets. Applied epoxy/cotton flox mix to Top Cowl outboard Inlets per Steps 4-9 ( 6mm & 10mm offsets). Drilled & Mach C'sunk 8 holes in Bottom Cowl to mount Inlet Baffles per Steps 4-6 at 47-28.
LH Bottom Cowl Inlet shaping |
RH Bottom Cowl Inlet shaping |
Bottom contoured, now Top needs to be re-shaped |
10mm offset on RH Side |
6mm offset on LH Side |
Top Cowl epoxy/cotton flox mix added |
Needed to improvise to Mach C'sink inner and outer locations. |
ready to mount Inlet Baffles |