Empennage Fairing ( 2 hrs )
Mixed epoxy/flox and filled pinholes on Emp Fairing (also some on 4 Instersection Fairings). Later, after cured 6 hrs, sanded smooth all 4 Intersection Fairings and Empennage Fairing. Began exploring where and how to mount various units supporting
Garmin G3X system: GTX-45 ( remote transponder w/ ADS-B in/out), GEA24 (engine monitor), GD-40 (CO detection), GPS20A (remote WAAS GPS), and GAD27 (intergrated controller). Referenced couple other RV14 builder logs, and Layout provided by Stein Air.
|
flox mix added to fill pinholes ( prior sand smooth... again) |
|
unpacking Avionics... |
No comments:
Post a Comment