I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Monday, January 15, 2018

Finish Kit

Torq Seal and Wing Fairings ( 2 hrs )

Did some "clean up" of some loose ends in Fuselage:  climbed into Fuse and managed to twist around until I could just barely reach nuts on 6 bolts for Engine Mount to apply torq seal.   Then moved into baggage area to confirm torques and apply torq seal to all fasteners on Elev pushrod bellcrank mount.  Nancy assisted me bending and unbending my 6'4" frame into this tight space.   Next I jumped to Sect 41-04 to Final Drill #17 holes, deburr all edges and holes as prep for LH & RH upper and lower Wing Fairings.

Saturday, January 13, 2018

Firewall Forward Kit

Sender Mount, etc ( 3 hrs )

Installed Sender Mount, adding fittings and hoses VA-102 and VA-119 (from Sect 49-11, Fig 2) prior to bolting onto Firewall.  Primed and painted "stainless steel rustoleum color" the Garmin Manifold pressure sensor bracket -- then mounted to Firewall.  Installed WH-P25 AWG Ground Strap, too.   Installed first Adel clamps (hose above, battery cable bottom) using safety wire trick.  Worked, but awkward.  May invest in speciality too for adel clamps since lots to do....


upper LH corner is MAP sensor bracket.

Friday, January 12, 2018

Firewall Forward

Starter Solenoid and Master Relay ( 3 hrs )

Started FF Kit ahead of engine delivery -- so I could mount components to Firewall easily.  Installed Master Relay and Starter Solenoid w/ connected wires per Sect 43-04, Steps 1-4.  Also partially assembled Sender Mount after first priming and painting.
Primed, painted "stainless steel".  Trial fit fittings.



Wednesday, January 10, 2018

Firewall Forward Kit

Prep for FF Kit / some Pushrods from Finish Kit ( 2 hrs )

Minimal shop time Jan 8 - 10 while working phones and emails with Vans, Stein Air, Aircraft Specialty, and Flightline Interiors.   Vans sending a few items missing/wrong in FF Kit (from 8 pages, only a few).   Working with Steve at Aircraft Specialty for hose upgrades:  planning to replace FF00014 hose with hose specifically made for the single P-Mag on my Lycoming IO-390 for the manifold air pressure sensor (from engine to both sensor and P-Mag).  Very helpful and high quality components (I installed their alum tubing fuel lines, hoses inside fuselage last year).  Working with Nick Millard at Stein Air to finalize Panel design.  They're sending bunch of components now (Auto Pilot Servos, ELT, etc) that I can install while waiting engine delivery.  Over several months (off and on) from concept to final design, Nick has been very helpful getting the Panel just right.  I've also launched Seat and interior development with Abby at Flightline Interiors.  Been a pleasure to get started, leveraging her experience.   Only shop work was building 2 Flap Pushrods per Sect 41-02, Steps 1-5, and 2 Stick to Torq Tube Pushrods per Sect 41-06, step 1.
3rd from bottom hose needs modified to work with P-Mag. 
Planning to replace with hose from Aircraft Specialty.

Latest, maybe final design of VFR panel. Will be black,with white engraved 
labels.  Toggle switches.  Moving T/P/M controls to bottom of panel, 
vs Vans orig design with addition below Panel (improves my knee room !)

Abby at Flightline Interiors had example of
Vinyl seat with fabric insert very similar to
our concept.  Not this logo w/ "pink" color...



Saturday, January 6, 2018

Firewall Forward Kit

Firewall Forward Kit Inventory ( 9 hrs )

Rec'd FF Kit on Jan 4 via Fed Ex in 3 medium size boxes.  One weighed 60 lbs, but other 2 were closer to 10lbs each.   Spent several hours on Jan 4, 5 and 6 upacking, counting, and storing parts from 8 page list with my wife's assistance.  Vans missed only a few parts out of a very long list, which I'm requesting corrections.  Now I have the rubber mounts to hang the engine soon (to start 2 month compression set prior working on cowl alignment).  Vans and Lycoming confirmed build date is Jan 22, so not long before receiving.   I also have throttle cables so I can mock up position just above bottom edge of panel, vs original just below.  This provides knee room to better accommodate my 6' 4" frame.  I'm working with Stein Air on final details of panel layout...and they've recently ordered all the Garmin avionics.
small parts fit into original storage boxes.

misc parts

exhaust parts in box, spinner beside, baffles,  & ducts

Wednesday, January 3, 2018

Finish Kit

Brake Lines ( 3 hrs )

Received from Van's the AN365-524 nuts to replace MS21083  N5 shear nuts on the Gear Braces per Sect 29-03 -- torqued per Sect 40A-04 (Fig 4).  See entry dated Dec 21, 2017.  Completed LH & RH Brake Line installation per Sect 40A-10 Steps 1-8, which was last page of Sect 40A "Tricycle Gear & Engine Mount".  Conforming 1/4" OD alum tube to align with Leg, then wrap around at bottom was "easier" than imagined.
straightened tubes, added various
pieces, then flared each end
 

 

will be covered by aerodynamic Leg fairing


route stays inside profile of  Wheel Fairing 
 

Saturday, December 30, 2017

Finish Kit

Axle Shims, Wheels & Brakes installed ( 4 hrs )

Ground two 8" x 3/8" Bolts creating drift pins for Wing to Spar assembly (Sect 41-03, Step 1).  Rec'd Shims from Vans, so installed immediately to correct excessive toe-in.   Now measures 0 deg for RH, and 0.15 deg for LH -- both within max 0.25 deg specified.  Installed Wheels per 40-09 Step 1, following both Vans and Grove instructions.   Installed Brake Caliper Assl'y per Step 2 at 40-09.  Safety wired two Back Plate Bolts on each Caliper - my first time doing bolts.  You-Tube has many example videos that really helped.   Need Permatex #59214 high temp sealant for pipe elbow fittings (for brake lines)...so not added yet in photos.
Waiting for Shims....so created Drift Pins for later
Shims arrived...Yay 
 
RH Shim installed,  0 deg measured
LH Shim installed, 0.15 deg measured



Wheel Nut & cotter pin installed

Grove Brake Calipers
Installed;  prior safety wiring Back Plate nuts


Tah Dah !   Now on all 3 Wheels

Safety Wire for Back Plate Nuts