
![]() |
| Stein Air build of panel is done...shipping soon. |

![]() |
| Stein Air build of panel is done...shipping soon. |
![]() |
| LH side... |
![]() |
| RH side... |
![]() |
| RH side test fit. Baffles lay down nicely ! |
![]() |
| LH side. Baffles also lay down nicely. Yay ! |
![]() |
| RH side Top & Bottom now matched again with new contour |
![]() |
| LH side...also re-matched. |
![]() |
| Overall. Cowl nearly 100% done. |
![]() |
| Engine view of RH inlet area with re-matched contours |
![]() |
| another engine side view. Lot of work, but nearly done ...w/ Cowls |
![]() |
| LH Bottom Cowl Inlet shaping |
![]() |
| RH Bottom Cowl Inlet shaping |
![]() |
| Bottom contoured, now Top needs to be re-shaped |
![]() |
| 10mm offset on RH Side |
![]() |
| 6mm offset on LH Side |
![]() |
| Top Cowl epoxy/cotton flox mix added |
![]() |
| Needed to improvise to Mach C'sink inner and outer locations. |
![]() |
| ready to mount Inlet Baffles |
![]() |
| RH Inlet Clamp "mold" removed. Tah dah ! |
![]() |
| LH Inlet Clamp removed. |

![]() |
| Sanded flush to edges. (prior to contouring) |
![]() |
| checking gap and contouring strategy |
![]() |
| rough marking prior to contouring |
![]() |
| consistent gap, with 2.4mm for rubber seal layer |
![]() |
| first pass contouring inboard (near spinner) |
![]() |
| inside view of contouring... Hard to see rounding underway to ease airflow |
![]() |
| Baffle seals installed |
![]() |
| LH: measuring gaps inboard to outboard |
![]() |
| RH side... |
![]() |
| Inlet Clamping Strips bent and clamped into place |
![]() |
| gaps matching measured widths |
![]() |
| RH side filled with epoxy/cotton flox mix...thick! |
![]() |
| LH side - removed tape on backside to insure mix filled "mold" |
![]() |
| overview....curing |
![]() |
| silicone tape over engine mount prior to nylon tie used to position cooling blast tube for LH Magneto |
![]() |
| 1st section done. |
![]() |
| All 3 sections "squeeged". Edges sealed with epoxy resin. |
![]() |
| seal sections are not labeled. So...need to check orientation carefully...some are nearly identical but slightly different. |
![]() |
| After bonding on .035" thick layer onto backside, getting ready to bond on retention blocks. |